The subject of the project concerns the thermal modernization of the building of the Municipal Health Center in Mniów, on the plot with registration number 549/12 area 0007 Mniów. The aim of the project is to increase the energy efficiency of public buildings and reduce greenhouse gas emissions by performing thermomodernization works. This objective is in line with Action 2.1. Energy efficiency of the European Funds for Świętokrzyskie 2021-2027 programme. The project includes tasks that will contribute to the protection of air quality and improve the level of energy efficiency of the facility. The material scope includes works consisting in the modernization of the domestic hot water system, heating system, interior ceiling partitions and flat roof. The windows and doors, lighting fixtures will be replaced and a 49.68 kW RES installation and an energy storage with a capacity of 74.52 kWh will be installed. The existing heat source, i.e. an eco-pea boiler (water co from a local heat source located in a heated building with insulated wires, fittings and devices that are installed in an unheated space), will be replaced with a pellet boiler with a power resulting from the Audit - a minimum of 52.62 kW. In order to improve the efficiency of the domestic hot water system, it is planned to install local heat pumps with integrated storage tanks with a minimum capacity of 20.88 kW (currently, the domestic hot water installation includes old-type electric storage heaters, highly energy-intensive). These investment activities will result in the creation of a fully functional and operational infrastructure. All fixed assets purchased and installed under the project will be new. The assumed output and result indicators will be achieved. Project implementation period from 22.11.2024 to 31.12.2026