Cyclically occurring extreme natural phenomena such as droughts and floods cause seasonal and spatial variability of water resources. This results in the need to take actions that would eliminate the negative effects of these phenomena. The answer to protecting and shaping water resources is so-called ‘small retention’, as a solution that does not affect the natural values of rivers and river valleys. Small retention contributes to increasing the potential retention capacity of small catchments and inhibits the rapid drainage of rainwater and meltwater, including through appropriate shaping of agricultural space, operation of drainage systems, small water reservoirs. Small retention is one of the most important elements of flood risk management and limiting the effects of drought. Promnik, municipality of Strawczyn. The reservoir does not play a recreational or touristic role, but plays an important role in the retention of surface waters. Its revitalization will positively affect the water balance and create conditions for increasing biodiversity. The reservoir will play an important role in reducing the effects of drought (drought management), storing water for economic purposes, improving the water balance of the area, it will also bring environmental functions - it will become a habitat for water birds. Low retention is an action supporting the implementation of EU Directives, such as: The Water Framework Directive, the Nitrates Directive, the Floods Directive and EU policies, including limiting the effects of climate change, protecting swamps, maintaining Natura 2000 sites. The project assumes: execution of construction works, mulching of the water pond canopy (with a layer of about 70 cm) and making a recess of 50 cm per area. 400 m 2 (deep place of wintering fish - the project provides for the possibility of restocking the reservoir at a later time) - renovation of the fortification of the slopes around the Pond. Made by removing the fortification of the slope from concrete slabs and re-arranging them after profiling the slopes to a slope of 1:2 to 1:2.5 on a non-woven fabric with a weight of 300 g / m 2 foot of the slope stabilize with a palisade of wooden pegs fi 15 cm length 1.0 m Alternatively, make a stone overlay in place of concrete slabs - repair of the dropping monk along with pipeline maintenance made by making a new steel structure of the monk from min 3,0 mm hot-dip galvanized U-shaped sheets with dimensions 80X80X80 cm whose crown will constitute the level of water accumulation in the pond - replacement of road barriers along Stawowa Street - length. 200 cm, pipes diameter 48,3 mm - hot-dip galvanized - to be concreted over a length of 74 m. Restoration as close as possible to the original state of the vegetation surrounding the pond in order to restore its current ecosystem function. As part of the task, a supervisory inspector will be hired to monitor the activities and supervise the investment in accordance with the approved project and the provisions of national and EU law that relate to this task. As part of the task, promotional and information activities concerning the project will be carried out - promotion of the project in the press, social media, on the applicant's websites and educational activities addressed to the local community. These activities will consist in the organisation of open environmental workshops at the Strawczyn Commune: Eco picnic - 1 day - 4 clock hours - in the form of an eco town, an event addressed to the residents of the Strawczyn commune, neighboring communes and tourists. The participants will have at their disposal 3 positions on which the topics related to the rational use of natural resources will be discussed, e.g. methods of monitoring and assessing the quality of water, soil - rational use of these resources and Eco-bus at the disposal of the participants of the game.