The investment is being carried out in the Chęciny Commune (14 804 inhabitants as at 31.12.2022). The scope of the project includes: 1 reconstruction of the University of Warsaw in Tokarnia with a capacity of Qśr = 954m3/d for living needs. The scope of modernization works includes, among others: •extraction of water with a capacity of Qe=97m3/h, two submersible pumps with a capacity of Qe=15m3/h and Qe=80m3/h, •modernization of the SUW building with the construction of a chlorine plant, a sanitary facility and the installation of a set of pumps II st. Qe=97m3/h, Hp=49m, •construction of a new container building with the installation of a reverse osmosis system with a Qe=15m3/h, •raw water pipeline well - SUW pump for reverse osmosis (RO) dn 90PE, L=59 mb+11mb = 70 mb, 2 replacement of the water supply network in the m. Zelejowa The current water supply network is from 1996 (28 years old) and needs to be replaced to reduce water losses. The following elements are envisaged: •Pipe water supply PE100 SDR17 PN10 by d. 160x9.5 mm and a total length of 527.0 m • PE100 pipe water supply RCSDR17 PN10 d. 160x9.5 mm and a total length of 267,0 m •Pipe water supply PE100 SDR17 PN10 d. 110x6,6 mm and a total length of 11,0 m • Water supply from PE100 SDR17 PN10 pipes with a d. 40x2,4 mm and a total length of 23,0 m • Fire hydrant DN 80 above ground with shut-off valve 5 set. 3 Modernization of water intakes in the Commune of Chęciny (Bridges, Bolmin, Korzecko, Starochęciny, Łukowa, Gościniec, Góra Zamkowa) and pumping station (Podzamcze, Lelusin, Chęciny ul. Jędrzejowska, ul. Spacerowa, ul. Zelejowa, Podpolichno) Modernization of shots and pumping stations includes: at each approach and pumping station, modernisation or replacement of control and supply cabinets; -at each point of view, purchase and installation of emergency power supply; real-time water analyzers 4 creating a flow monitoring point with installation, the scope of work includes the installation of measurement points on the network to reduce water losses. 5. As part of the task, hydrants that are malfunctioning in m will be replaced: Chęciny, Tokarnia, Wolica, Ostrów-Gaj, Ostrów, Ostrów- Golęciny, Siedlce, Ostrów-Wymysłów, Lelusin, Łukowa, Starochęciny, Lipowica, Radkowice, Wrzosy, Podzamcze, Podzamcze Dolne, Gościniec, Polichno, Skiby, Podpolichno, Miedzianka, Korzecko, Bolmin, Milechowy. 6. Modernisation of the emergency section of the network in Korzecko240 mb 7.Cleaning and disinfection of the drinking water reservoir 8. Construction of 7 PV installations with a capacity of 49.5 kW [Tokarnia, Korzecko, Bolmin, Mosty, Starochęciny, Gościniec, Łukowa] •photovoltaic panels, •inverters with wiring, •connectors, AC, •installation of gPV security on each string on the DC side, •installation of RCD type A security, 9. educational and awareness activities in the field of proper management of water resources and water saving. The measures include printing and distribution of information leaflets and posters, as well as educational picnics devoted to the importance of water (and its saving) in each school in the Chęciny district. 10. investor supervision, project promotion - as described in section I. The investment is fully ready for implementation, i.e. it has all permits/decisions: - holds permit No 1622/2023 of 02.11.2023 [B-IV.6740.1.11.13.2023.K] for the reconstruction of the water intake in Tokarnia, Decision on the lack of need to carry out an environmental impact assessment for the project for the reconstruction of the water intake in Tokarnia [GNOŚR-V.6220.4.2020.EJ of 18.12.2020], water permit No KR.ZUZ.1.4210.139.2021.IM - Notification of the intention to carry out construction works of 08.11.2024 together with the certificate [B.IV.6743.1.11.65.2023.KM of 12.12.2023] concerning the modernisation/replacement of the water supply in m. Chęciny -Scope of the investment concerning the creation of a flow monitoring point with assembly and construction of a photovoltaic installation on the basis of the Tokarnia plant with a capacity of 49.5 kW do not require environmental notification/decisions. The investment was included in the INVESTMENT PROGRAMME FOR IMPROVING THE QUALITY AND LIMITING LOSS OF WATER INTENDED FOR HUMAN CONSUMPTION [2283, 2284]