This project assumes the extension of the provincial road No. 182 (ul. Kościuszki) in Czarnków on the section of the intersection with DW No 181 to the roundabout at the intersection with ul. Garden and Gymnasium. The planned investment includes: - reconstruction of the roadway of the provincial road No. 182. - reconstruction of a section of provincial road No 181, - construction of an access road connecting the provincial road with the internal access road to the hotel, - reconstruction of a section of Parkowa Street, - construction of a road along Parkowa Street, - replacement of the road surface at the John Paul II roundabout, - construction and reconstruction of intersections with public roads, - construction and reconstruction of exits, - construction and reconstruction of pedestrian crossings with asylums (including two with signalling), - construction of a bicycle path, - construction of a bicycle path that can be used by pedestrians, - construction of pavements, - construction of bus bays, - construction and reconstruction of parking lanes, - construction of a driveway for the disabled, - construction of ground roadsides, - reconstruction or protection of conflicting technical infrastructure equipment, - construction of rainwater drainage, - construction of road lighting, - construction of dam walls, - construction of traffic safety elements, - felling trees and shrubs, - greenery installation. Design parameters for provincial roads: - Lane width: 3,5m, - surface load capacity 115 kN/axle. The above works will be carried out on a section with a length of 1,495 km (on a section from km approx. 66+588 to km approx. 68+083) Rainwater and meltwater from the designed roadway on the entire developed section of the road is planned to be drained surfaceally by means of a longitudinal and transverse drop to street drains. Further down the sewers, the water will be drained into the designed rain channel, and then to the place of discharge (existing rainwater sewer). Walkways and bicycle paths located at the roadway will be drained to the roadway and further to the rainwater drainage, while located behind the green belt to this greenery. Rainwater and meltwater, which will go to the designed rainwater sewage network, will be discharged to the collective collector, where they will be mixed with other rainwater and meltwater from the area of the city of Czarnków. The solutions proposed in the project significantly improve the geometry of the road and increase the safety of traffic users, including cyclists and pedestrians. The planned investment within DW 182 is economically justified and necessary for road safety reasons. Project outputs: Length of upgraded or reconstructed provincial roads: 1,495 km/year 2025. Number of projects that financed reasonable accommodation costs for persons with disabilities (ERDF/CF/JTF): 1 pc(s) /year 2025