The project envisages the construction of bicycle roads in the area of the Kleczew commune with the necessary accompanying infra. The scope of the investment includes the following sections: - walking and cycling path on the section Budzisław Kościelny - Adamowo, - cycling path in Budzisław Kościelny on the section from ul. Słoneczna do Szkolna, - bicycle path on the Sławoszewek-Sławoszewo section The project includes equipment with accompanying infrastructure improving the comfort of the cyclist: - Walking and cycling path between Budzisław Kościelny and Adamowo: Along the path, 3 rest areas with dimensions of 5.0 m x 2.0 m are designed, limited by a concrete edging 8x30 with a bench and a bicycle stand and a trash can. The resting place in km 2+620.0 will also be equipped with a gazebo with a wooden structure with a roof measuring 5.0mx2.0 m and a self-service bicycle repair station - Bicycle path in Budzisław Kościelne on the section from ul. Sunny to School: Along the path at the exit into Szkolna Street, there is a resting place with a bicycle rack (min 4 places), a bench and a trash can. - Cycle path on the Sławoszewek-Sławoszewo section: During the cycle path, 3 resting places with a bench, a bicycle rack and a trash can are planned. It was also designed to install a repair station for bicycles. The project envisages actions contributing to the reduction of electricity consumption and CO2 emissions: - Walking and cycling path between Budzisław Kościelny and Adamowo: solar-wind hybrid lamp mounted on a pole in the rest area, - Cycle path on the Sławoszewek-Sławoszewo section: four hybrid lamps were designed at pedestrian crossings. Hybrid lanterns illuminating the pedestrian crossing, As a result of the rea. of the project, a cycling infrastructure will be created that will allow the development of alternative forms of movement to motorized transport. In order to increase the long-term benefits, the project is planning to carry out an educational and inf.-prom. activity on the promotion of cycling, as well as a fair and green energy transition. Among other things, it is planned to: bicycle rallies (2 x PLN 7,500.00 = PLN 15,000.00), picnics (2 x PLN 2500.00 = PLN 5,000.00). The material scope of the project includes the following categories of expenditure: 1. Construction works – construction of bicycle paths in Kleczew 2. Investor supervision 3. Information and promotion activities on public transport, cycling and walking, as well as on the just transition 4. Information and promotion of the Harmon project. real. project: - start date of project. - 01.05.2025 - Project completion date – 30.11.2025 The project is a stand-alone (operational) unit of analysis. The investment tasks planned in the project are aimed at creating a fully functional and operational infrastructure. The solutions adopted in the project are characterized by functionality and durability required for this type of infrastructure. The construction of cycle paths in the municipality of Kleczew will contribute to achieving tangible benefits from increasing the use of cycling in everyday journeys for road transport, which will contribute to reducing the negative impact of motorised traffic on the environment and residents. Kleczew Commune is located in the area of Eastern Wielkopolska, which will significantly feel the effects of the energy transition. It will be important to use the region's development potential in the form of, among others, favorable geographical location, industrial traditions, tourist potential. For the development of the Great. Tackling environmental degradation and adapting to climate change is an extremely important challenge for the East. Activities promoting and developing non-motorized transport in the city area give a real chance to reduce the level of emissions of harmful substances into the air.