Water saving hotel Jelenovská The subject of the project implementation is an investment in the rainwater collection and accumulation system, which includes the construction of two plastic interconnected storage tanks with a volume of 5 m3, filtration and sanitation system of rainwater (UV lamp), distribution of treated rainwater to toilets and at the same time the replacement of washbasin and shower batteries with perlators and installation of new toilets.share on FacebookTwitterLinkedinEmailreport an issue