The subject of the project is the reconstruction of the line section, including the connecting railway stations. The implementation of the project will also ensure the interoperability of the PRM TSI subsystem for persons with reduced mobility. The basic requirement is to increase the line speed and, for freight transport, to reconstruct the railway station for possible overtaking of trainsets. After the construction, the ETCS system will be deployed. The basic object of the construction is to ensure the operability and safety of train transport.