The aim of the project is to build 90 DC charging stations (90 charging points) for electric vehicles at 25 locations within selected priority areas on the TEN-T network and the "20 most suitable areas for the location of charging stations". The recharging points will have a rated output of 150 kW, resulting in a total new station capacity of 13 500 kW. In 100% of cases, the applicant has mapped titles to sites for the location of recharging parks.