The main objective of the project is to maintain water in the landscape by replacing areas that are impermeable to permeable. Rainwater will be retained at the site in question and, under normal conditions, rainwater will be soaked into the subsoil. The subject of the project documentation is to complete the modification of the existing paved asphalt surface, which is used for the decommissioning and parking of vehicles. The area is located on the opposite side of the bus station. All land related to the realization of the construction is owned by the applicant.