The project solves the current unsatisfactory state of MVN Linhart, which is in a very unsatisfactory state. This was triggered by the fact that MVN was left to natural development without maintenance for many years, a situation amplified by the passage of the local flood wave in 2014. As part of the project, a complete reconstruction of the building will be carried out, consisting in the repair of the dam body, its mud removal, including the removal of airborne trees, the reconstruction of the drainage equipment and the modification of the foothills.