The subject of the project is the extension of the Zubří water supply and the provision of water supply in the streets of Čertoryje and Pod Javorníkem. The aim of the project is the construction of a new water supply line with a total length of 922 m (length of the extended water supply line 908 m and turn-off in the length of 14 m), an ATS station and an outdoor NN sampling facility. With the implementation of the project, 52 inhabitants will be newly connected. The project meets the requirements for full project preparation. The total eligible expenditure of the project is CZK 4 912 246.04 excluding VAT.