Kohesio: discover EU projects in your region

project info
Start date: 2 September 2024
End date: 28 August 2026
funding
Fund: Cohesion Fund (CF)
Total budget: 586 840,91 €
EU contribution: 410 788,63 € (70%)
programme
Programming period: 2021-2027
European Commission Topic
European Commission Topic

Water pipeline in Ryba and U Dubu

The aim of the project is to build a water supply network in the length of 1565m and 82 connections in the length of 185.98m in the locality Ryba and 451m and 14 eligible connections in the length of 49.60m in the locality U Dubu. A total of 2,251.58m rows with connections will be built and 343 inhabitants in the localities will be connected to the supply of quality drinking water. ATS Fish must be built in the Fish to ensure pressure in the system. Residents of these localities have long struggled with the scarcity and, above all, poor quality of water from their own wells.

Flag of Czechia  South Moravian Region, Czechia