The project focuses on the conceptual and analytical part of revitalization of the site. This part of the residual channel of the Bílina River is currently used for the gravitational diversion of mine waters from the CSA quarry to the Bílina River. The area is therefore permanently aquifered and there are water-related ecosystems. The purpose of the project should be a feasibility study with all necessary surveys of the area to solve the question of how to effectively use the locality of the residual bed and its immediate surroundings in the future.