Kohesio: discover EU projects in your region

project info
Start date: 1 January 2021
End date: 31 December 2025
funding
Fund: European Regional Development Fund (ERDF)
Total budget: 182 519 799,64 €
EU contribution: 178 869 403,65 € (98%)
programme
Programming period: 2021-2027
beneficiary
European Commission Topic
European Commission Topic

The regional project for the development of water and wastewater infrastructure in the operating area of S.C. RAJA S.A. Constanta, in the period 2014-2020

The overall objective of the project is to improve the water and sewerage infrastructure in the localities of the project area in the counties of Constanta, Ialomita, Ilfov, Calarasi, Dambovita and Brasov included in the project, in order to fulfill the obligations established by the Accession Treaty and the relevant European Directives. The project contributes to achieving the results of the LIOP, SO 3.2, and compliance with EU directives: By 2023: CO18 = 305.200 inhabitants; CO19 = 214.498 p.e / 125.696 inhabitants; The level of compliant connection of biodegradable organic load (in p.e.) to collecting systems in agglomerations in the project area will be 96.57% (822.701 p.e). 2S33 - After the investments in LIOP, the degree of connection to compliant water supply services will increase to 99.66% - 640.894 inhabitants, respectively 305.200 inhabitants will be compliant at the end of the project. 2S30 – 4 compliant SEAs (Negru Voda, Baneasa, Jegalia and Cazanesti) are planned for 4 agglomerations as

Flag of Romania  Multiple locations, Romania