The overall objective of the project is to improve the water and sewerage infrastructure in the localities of Suceava County included in the project, in order to meet the obligations established by the Accession Treaty and the relevant European Directives. Through the project, the following indicators set out in the LIOP (Phase I of project implementation) will be achieved by 2027 through the PDD (Phase II of project implementation): • CO18 (Water distribution; Additional population benefiting from better water supply) = 65783 inhabitants • CO19 (Wastewater treatment: Additional population benefiting from better waste water treatment) = 107108 equivalent inhabitants. Through these indicators, the project will contribute to achieving the objective of LIOP - SO 3.2, respectively PDD - O.S. 2.5, as well as to compliance with European directives, as follows: The degree of connection, before the project, to the water supply system, in the project area, is 75% - 166493