The overall objective of the project is to increase the contribution to the streamlining of cargo flows generated by the conflict in Ukraine and to reduce the blockade in the Black Sea area, by extending the operating capacity of the CSCT port operator and thus of the Constanta port. The project thus contributes to the objective of the call for projects: Investments in the port superstructure for loading/unloading and storage of goods in order to reduce the blockade in the area of Romanian ports as a result of the blockage of Ukrainian shipping routes - call code: PT/237/PT_P7/OP3/RSO3.1/PT_A16, i.e. the State aid scheme for investments in the Port Superstructure for loading/unloading and storage of goods in order to reduce the blockade in the area of Romanian ports following the blockade of Ukrainian shipping routes, approved by EC Decision No C(2024) 23/11.01.2024. The war in Ukraine and the redirection of grain to the Port of Constanta led to a