One of the main activities of this project is the construction of a new water intake, which makes it possible to close the boreholes affecting Lake Kurtna in the Vasavere water intake. As a result of the activity, the water level of the lakes affected by water abstraction increases and as a result, the type-specific biota of the lakes is restored and the good ecological status of the lakes is achieved.