Kohesio: discover EU projects in your region

project info
Start date: 1 July 2024
End date: 30 June 2027
funding
Fund: European Regional Development Fund (ERDF)
Total budget: 4 026 000,00 €
EU contribution: 2 818 200,00 € (70%)
programme
Programming period: 2021-2027
intervention field
European Commission Topic
European Commission Topic

Construction of the core network of bicycle paths on the Sõpruse bridge and in the neighbouring area of Karlova

In the construction of the main network of bicycle paths on the Sõpruse bridge and in the neighbouring area of Karlova, the infrastructure has been designed to favour pedestrians and cyclists and to merge Annelinn and Karlova into an urban space to increase the share of daily cycling and walking. A total of 2,600 metres of the main network of cycle paths will be built. The widths vary from section to section. The bridge has 2.25 m for cyclists and 2.0 m for pedestrians. The connecting streets have widths from 4.0 to 4.5 m, i.e. 2.0 m for pedestrians and 2.0 to 2.5 m for cyclists.

Flag of Estonia  Lõuna-Eesti, Estonia