Complementary Intervention for the Construction of Management and Treatment Systems for Contaminated Water, Soil and Sludge in Radioactive Mining Areas After the previous intervention, it is intended to build a set of structures and install equipment with the aim of increasing technical efficiency in the regularization and flow management of the volumes generated pre and post treatment, and to enable the existing structures and solutions of conditions that promote the prolongation of their service life, safeguarding the quality parameters of the remediation solutions developed.share on FacebookTwitterLinkedinEmailreport an issue