Kohesio: discover EU projects in your region

project info
Start date: 9 October 2024
End date: 31 December 2029
funding
Fund: European Regional Development Fund (ERDF)
Total budget: 2 792 979,83 €
EU contribution: 2 246 532,84 € (85%)
programme
Programming period: 2021-2027
European Commission Topic
European Commission Topic

Energy Upgrade of the Indoor Swimming Pool of Ioannina

The proposed interventions plan primarily meets the energy needs of the swimming pool The installation of the BEMS system is the main tool for the preparation of an energy management plan for the swimming pool responding to the requirements of Law 43422015 and the European Directive of 30 May 2018 The combination of a plan of actions that incorporate best practices and a tool that allows energy planning to establish and mainly monitor indicators of the energy behavior of the swimming pool ensures to the maximum extent possible that its operation is completely controlled and therefore efficient The establishment of the virtual netmetering netting methodology leads to the optimal performance of the system resulting in maximum energy savings, the reduction of pollutants at national level and a very significant reduction in energy costs.

Flag of Greece  Multiple locations, Greece