CONSTRUCTION OF A BRIDGE IN CHTH 0450 OF EO NO 53 This act provides for the implementation of the project "CONSTRUCTION OF A BRIDGE IN CHTH 0450 OF EO NO 53" concerning the construction of a bridge on the Irene Stream in a position south of the existing bridge about 5 km from the city of Alexandroupolis and belongs to the wider National Road Network of the Regional Unit of Evros The total length of the project is 116200m and includes the construction of a road construction, the construction of a bridge consisting of three panels with theoretical openings distance between support points L3525m and a total length of 11212 meters as well as the construction of a crate with dimensions 400 x 547556share on FacebookTwitterLinkedinEmailreport an issue