Kohesio: discover EU projects in your region

project info
Start date: 1 August 2024
End date: 31 January 2026
funding
Fund: European Regional Development Fund (ERDF)
Total budget: 2 421 185,92 €
EU contribution: 2 058 008,03 € (85%)
programme
Programming period: 2021-2027
European Commission Topic
European Commission Topic

Energy Upgrade of the Poseidonian Nautical Sports Center of Thessaloniki

The operation follows good planning practice The proposed interventions plan primarily meets the energy needs of the swimming pool Utilizes the potential for energy savings leading to energy housekeeping and based on its new energy profile, interventions of a high-efficiency combined heat and power system are planned in the facilities of the swimming pool The installation of the BEMS system is the main tool for the preparation of an energy management plan of the swimming pool responding to the requirements of Law 43422015 and the European Directive of 30 May 2018 The combination of a plan of actions that incorporate best practices and a tool that allows energy planning to establish and mainly monitor indicators of the energy behavior of the swimming pool ensures to the maximum extent possible that its operation is completely controlled and therefore efficient The establishment of the netmetering and virtual netmetering netting methodology leads to the optimal efficiency of the system with consequently the maximum energy savings, the reduction of pollutants at national level and a very significant reduction of energy costs The proposed interventions plan after its implementation will achieve primary energy savings 5456374MWh 0469 KTOE

Flag of Greece  Βόρειος Τομέας Αθηνών, Greece