Construction of the water supply network of the Municipality of Kavala Completion of the internal network of the settlement of Zygos, Philippi The water supply network of the settlement of Zygos that is proposed to be replaced is supplied by the water supply tank of the settlement located at an altitude of H 225 meters follows the existing road construction of the area and includes three 3 individual categories of networksThe primary network that includes 22 pipes from HDPE10 PN pipes with diameters between Φ110 and Φ200 with a total length of 5032 metersThe secondary network also from HDPE10 PN pipes that consists of pipes with diameters Φ63 with a total length of 11409 meters The third network from HDPE10 PN pipes with diameters between Φ25 and Φ50 that includes 150 private connectionsThe network will also be placed in suitable positions three 3 evacuators six 6 air-extractors and thirteen 13 new fire-exting outletsshare on FacebookTwitterLinkedinEmailreport an issue