Bioclimatic Regeneration of the main connecting roads of the city of Rethymno B PHASE The object of the proposal is the 2nd Phase of the regeneration of seven roads in the center of the city of Rethymno Six of them connect vertically the already reconstructed central arteries of the city of L Kountourioti and Moatsou Street The seventh road is parallel to the central arteries The total length of the regeneration of all seven roads is about 800 meters The total regeneration area of all 7 roads is about 9000 square meters New sidewalks are constructed with a minimum width in some places of 1 meter and 60 cm. with the exception of Paren Siganou street which was chosen as a neighborhood road to be coated along the entire length with cement block The cement block is used as a material for the coating of all the indentations created for parking spaces In the section of the eastern pavement of Prevelaki street starting from Kountourioti Avenue and for about 35 meters it is proposed to reconstruct the existing partition wall of the primary school there with the aim of greater widening of the pavement The minimum width of vehicle passage is 320 meters The maximum is 350 metersshare on FacebookTwitterLinkedinEmailreport an issue