Energy saving and energy upgrading interventions of the 5th Primary School of Rethymno The proposed project provides for the energy upgrade of the building by carrying out works that will contribute to the drastic reduction of the energy consumed to create the desired conditions within the building The works foreseen in the outer shell of the building and not only are the following1External thermal insulation on all external opaque surfaces of the building which are currently not insulated.share on FacebookTwitterLinkedinEmailreport an issue