Start date: 9 August 2023
End date: 31 December 2027
funding
Fund: European Regional Development Fund (ERDF)
Total budget: 286 084,69 €
EU contribution: 243 171,99 € (85%)
programme
Programming period: 2021-2027
European Commission Topic
European Commission Topic

WATER SAFETY PLAN AND WATER PROTECTION POINTS OF THE MUNICIPALITY OF SLOW OPENING

SUB-PROJECT 1The object of the project is the elaboration of a water management study for the implementation of a Water Safety Plan in the Municipality of Argos Orestiko in application of the River Basin Management Plan of the Water District of Western Macedonia EL09The elaboration of the Water Safety Plan is required in the context of the country's international obligations and the ultimate objective is to ensure public health and the adoption and implementation of good practices in the drinking water distribution network SUB-PROJECT 2 The object of the project is the elaboration of a Special Hydrogeological Study in application of the River Basin Management Plan of the Water District of Western Macedonia EL09 in order to define zones and measures for the protection of water abstraction points intended for human consumption from underground water systems in the area of responsibility of the Municipality of Argos Orestavylic Hydraulic Study for the control of technical and hydraulic adequacy conditions at the sources of the water supply system where the individual abstractions of the network are located

Flag of Greece  Καστοριά, Greece