Kohesio: discover EU projects in your region

project info
Start date: 13 September 2021
End date: 31 December 2027
funding
Fund: European Regional Development Fund (ERDF)
Total budget: 452 600,00 €
EU contribution: 116 650,00 € (50%)
programme
Programming period: 2021-2027
European Commission Topic
European Commission Topic

Functional and environmental upgrading of Agios Dimitrios pedestrian street

The purpose of the act entitled Functional and Environmental Upgrade of Aghios Dimitrios pedestrian street is the functional and environmental upgrade and remodeling of the common areas located on the pedestrian street of Aghios Dimitrios which starts from Theomitoros street and ends at G Papandreou street in the Municipality of Alimos and the homonymous existing stream Along the pedestrian street of Aghios Dimitrios there was a stream that has been replaced with a rainwater duct on the surface of which this planting and green area has been formed, offering an important recreational area to the residents. new cool material cylinders to ensure the uninterrupted and safe movement of pedestrians with the parallel parking of vehicles simultaneously with the improvement of thermal comfort2Creation and siting of new parking spaces at the junction with the perpendiculars in Agios Dimitrios streets for the permanent residents of the area and the visitors of the spaces3Reconstruction and improvement of the existing municipal electric lighting network by replacing the damaged conventional luminaires with Led technology luminairesTo achieve the above, the accessibility of the spaces has been taken into accountclear signage their safe demarcation with fencing and entrance certain adequate and functional lighting of the spacesUse of modern materials friendly to the environment either on the side of energy saving or on the side of thermal comfort

Flag of Greece  Νότιος Τομέας Αθηνών, Greece