Modernization and Upgrading of the War Museum Phase B The above systems are to be supplied and installed in order to achieve a reduction in primary energy consumption in the War Museum building in such a way that it is upgraded from energy class H, which concerns the current situation to energy class A. The proposed energy upgrade is expected to reduce the operational cost of the building drastically while improving thermal comfort conditions.share on FacebookTwitterLinkedinEmailreport an issue