Kohesio: discover EU projects in your region

project info
Start date: 1 June 2023
End date: 31 December 2029
funding
Fund: Cohesion Fund (CF)
Total budget: 8 347 677,63 €
EU contribution: 6 064 428,61 € (85%)
programme
Programming period: 2021-2027
European Commission Topic
European Commission Topic

SUPPLY AND INSTALLATION OF AN INTEGRATED REMOTE CONTROL SYSTEM FOR THE TRANSPORT AND DISTRIBUTION OF DRINKING WATER ISLAND CHIOSV PHASE

The project entitled Supply and installation of an integrated remote control system of the drinking water transmission and distribution network Chios Island aims at reducing leakages, saving water resources, reducing energy consumption, monitoring and improving the quality of the supplied water as well as creating an integrated water resource management system of the water supply network on the island of ChiosThrough the installation and operation of the integrated system will create the required background for recording losses of the network through which will be ensured the necessary data for the calculation of the water balance. from ninety-nine 99 Local Control Stations TSE The project includes the supply of portable equipment for measuring the supply of drilling levels and temperatures

Flag of Greece  Χίος, Greece