Improvement Configuration of Maroneia beach road of Petrota N Evros B' PHASE In the framework of the project, a new horizontal alignment of the road Maroneia beach Petrota N Evros length 14658 m starting at the level junction south of Maroneia to Agios Charalambos and ending at the junction with the road Petrota Paralia The cross-section to be applied will normally have a total circulating width of 65 m. There are also parking spaces construction of a paved walkway construction of a total of 80 technical works for water runoff and 1 bridge as well as road lighting and signage works.share on FacebookTwitterLinkedinEmailreport an issue