PANAGIOTIS VOUNATSOS S.A. Green Transformation SMEs This investment plan is developed in three pillars Aims at the establishment of a branch new facility for the construction of a ground floor building with underground liquid fuel station washing machine vulcanizer position 'Neftis or Newtis' Agricultural Region of Kalloni Municipality of Western Lesvos The physical object of the project concerns the construction of the load-bearing structure of the building that will be made of reinforced concrete The filling organization of brickwork and roof reinforced concrete slab and all the other construction works for the completion of the facilities that will house the liquid fuel station washing machine vulcanizer lubricator and the supply of the corresponding fixed mobile production equipment For the project, actions and costs of environmental protection and reduction of the environmental footprint of the project solar forced circulation heat pump LED Lighting Compensation of reactive power electric consumptionBFor the main store in Tamparia Karatepes Municipalities Mytilene the objective of the operator is to install automatic mechanical washing machine automatic washing brush in a covered area in order to expand the production capacity that requires the fundamental change of the entire production process of existing manual vehicle washing machines At the same time the objective of the operator for the installation of the liquid fuel station in the position Tampakaria is to upgrade the mechanical equipment plasterboard to expand the production capacity C. For the branch in the position Koufopetra Alifanton Municipality of Mytilene the objective of the operator is to install automatic mechanical washing machine automatic washing brush in a covered area to expand the production capacity that requires the fundamental change of the entire production process of existing manual vehicle washing machinesshare on FacebookTwitterLinkedinEmailreport an issue