The project concerns the construction of the road connection of Lefkada with the road axis Aktio West Axis through two new road sections The first from Vonitsa to Lefkada with a length of about 160 km and the second from Aktio to Agios Nikolaos with a length of about 50 km The two new road sections replace or improve the existing sectionsThe physical object includes the construction of side roads with a length of about 895 km 1 bridge 2 underpasses 7 level junctions and 3 high retaining walls. PhasesIn the framework of the NSRF 20212027, Phase B is financed, which includes the completion of the remaining works for the construction of the road link between Lefkada and the road axis Aktio Western Axis, part of the expropriation costs, part of the relocation works, restorations of public utility networks and connections to them, part of the costs of archaeological research and works, part of the Consultant's costs, the costs of the Green Study, the works for the installation of greenery and related infrastructure, as well as part of the works of the 1st Supplementary Work Contract of the main Subproject Subproject 1