The object of the project is the reconstruction of the III. Class III/4787 road with a total length of 0.438 km and the construction of new bridges. These are two road bridges over the runway (Eastern and Western) and two road bridges over road I/11 (Eastern and West), which are located in the territory of Ostrava. The main objective of the project is to improve the unsatisfactory construction status of bridge buildings and thus maintain the connection of the Ostrava-South city district.