The object of the project is the interconnection of ul. Místecký (I/56) and ul. Paskovská (II/478) in Ostrava-Hrabová. The proposed link connects to the existing street Mostní at the junction with ul. It’s Paskovsky. Proposed extension of ul. The bridge will be the second class road No. 478 and will connect the industrial zone Hrabová and the forces. I/56 (ul. Místecká) with the streets Frýdecka and Vratimov. The physical implementation period is 540 days. The target group is all road users. The aim is to improve the quality of transport, interconnection and increase safety.