The subject of the Project is the securing and modernization of 94 level crossings and one pedestrian crossing with automatic electronic signalling and safety devices that use modern devices with light signals in LED technology and strong bells to ensure safe traffic flow, while at 79 LCP, in addition to the above, the installation of semi-guards is planned. Phase II covers 84 level crossings and one pedestrian crossing. Out of the total number of crossings, 10 RACs are covered through Phase I of the Project and part of the costs for the works carried out on these 10 RACs from Phase I and the cost of expert supervision under Unit No 6/22-EU starting from May 2023 will be claimed through the SSC in Phase II, since these costs have not previously been claimed through the SSC in Phase I.