The project "Maritime Passenger Terminal Resnik-Divulje" improves maritime transport, relieves capacity and connects the mainland, Split Airport and islands. It includes the construction of a pier (53x6 m) and the extension of the coastal wall (52.27 m), allowing, in addition to the existing one, an additional mooring of two vessels up to 40 m and one catamaran. Port excavation (-5.30 m) increases safety. Energy-efficient solutions, including LED lighting and ship connectors, are planned. Traffic is expected to grow by 38,678 passengers by 2028 and contribute to sustainable mobility and environmental performance. The project increases maritime transport capacity and contributes to the diversion of traffic from roads to sea.