The object of the project is the reconstruction of communication II/112. As part of the reconstruction, the nivelette will be increased by min. by 10 mm in the section km 9.480-15.075 and km 16,800-17,788 and by 90 mm in the section 15.075-16.800, with the fact that the width arrangement will be maintained. Part of the construction is the restoration of unpaved sideways and their modification to the required width of 0.75 m. Further, the drainage system from deposits and possible repair of pipe culverts under the road will be cleaned.