The aim of the project is to increase the possibility of connecting sources of RES electricity generation without simultaneously reducing the parameters of the supplied energy and minimising the risk of failures and interruptions in the supply of energy (relevant barriers to the development of renewable energy will be removed). As a result of the project, the possibility of connecting electricity generators from RES will be increased. In addition, the conditions for powering those affected by the station will be improved. The direct objective, and thus the project, is in line with the objectives of the Operational Programme, the priority axis and the actions and sub-measures 1.1.2 of the OP. The project covers the construction of a new power station GPZ Skwierzyna II 110/15 kV consisting of a 110 kV switchgear and a 15 kV switchgear. The station is part of a distribution network at a voltage of 110 kV, where electricity is transformed to a voltage of 15 kV with a supply line of 110 kV and outputs of 15 kV.