The aim of the project is to increase the potential for connection of renewable energy sources in the area where station conversion is planned (and in the area of related activities related to network change), as well as to improve security of electricity supply. The project will result in: — Reconstruction of the 110 kV/SN power grid infrastructure to create the potential for RES connections – within the OSD network will increase connectivity for new RES power generators, – Increasing the distribution capacity of RES power through the construction of stations together with the implementation of related tasks changing the network configuration. In addition, the implementation of the Project will contribute to: — elimination of voltage and load hazards; — improving the certainty of the power output from RES; — improving the supply certainty of the 110/SN station; — the ability to reconfigure the network system in order to eliminate unfavourable power transmission phenomenon with a 110 kV network; — improving the efficiency of the distribution system.