The scope of the project includes the construction of a new power station GPZ Suchy Las 110/15 kV consisting of 110 kV switchgear and 15 kV switchgear, construction of a power line of 110 kV, and connections with the SN network. The station is part of a distribution network at a voltage of 110 k, where electricity is transformed to a voltage of 15 kV.