The scope of the project includes the construction of a new power station GPZ Kostrzyn II 110/15 kV consisting of a 110 kV switchgear and a 15 kV switchgear. The station is part of a distribution network at a voltage of 110 kV, where electricity is transformed to 15 kV with 110 kV power lines and 15 kV outputs. WN/SN Kostrzyn II station will be located in Kostrzyn nad Oder in the commune of Kostrzyn nad Oder, which is currently in the management of the Kostrzyn-Oder commune. The project’s objectives at product level are: construction of 1 power stations; additional capacity to connect renewables to the electricity grid. The project’s objective at the result level is to reduce greenhouse gas emissions. The project is implemented in turnkey mode. Investor supervision will be carried out by own forces of ENEA Operator Sp. z o.o.