The scope of the project covers infrastructure expenditure (97.30 % of construction work, 1.76 % of supervision) and non-infrastructure expenditure. Non-infrastructural expenditure includes: project documentation, audits, cost-benefit analysis (0.74 %) and promotion costs (0.20 %). The parentheses indicate the percentage of the total eligible categories of expenditure. As regards works, the following are envisaged: —working of thermal insulation and anti-moisture insulation of foundation walls – performance of thermal insulation of floors in the basement and on the ground floor (fitting on the ground) together with reconstruction of floor layers – warming of the walls of the so-called.