Kohesio: discover EU projects in your region

project info
Start date: 3 October 2016
End date: 31 August 2023
funding
Fund: Cohesion Fund (CF)
Total budget: 6 702 345,00 €
EU contribution: 5 014 249,41 € (74,81%)
programme
Programming period: 2014-2020
Managing authority: Ministerstwo obsługujące ministra właściwego ds. rozwoju regionalnego
European Commission Topic

Expansion of the distillery complex at Brunatna Street in Konin, Maliniec

The main objective of the project is to build installations producing electricity and heat in the technology of high-efficiency cogeneration from renewable energy sources. Achieving the objective will make it possible to achieve a positive environmental impact by ensuring significant quantified energy savings and allowing increased use of high-efficiency cogeneration in Poland and an increase in the share of renewable energy sources in the country’s energy balance. The installation of high-efficiency cogeneration will be located at ul. Brown in Konin, on the plot No. 269, Konin Maliniec 0008, Wielkopolska voivodeship (the less developed region). The project aims to achieve the following objectives: — installation of equipment with a total electrical capacity of 2,134 MWel; — installation of equipment with a total thermal input of 2,188 MWth; — annual production of biogas of 7380000,00 m³; — annual net electricity production of 16098.16 MWh, gross: 17498,8 MWh; — annual net heat production of 46.989.05 GJ, gross: 64 589,76 GJ; — reducing carbon dioxide emissions by replacing electricity and heat produced conventionally produced from renewable sources 28 432.24 tonnes of CO2 per year; — the supply of heat to the distillery; — acceptance of waste from agricultural production; — creation of 3 jobs; — increasing the country’s energy security and diversification of sources of electricity.

Flag of Poland  Koniński, Poland