The project will be located in Lubelskie Voivodship, Świdnik County, Świdnik Municipality and the Municipality of Mełgiew and concerned draining and cleaning of rainwater from the Municipality of Świdnik. The total length of the collector draining precipitation and melt water from the City area is 3.87 km, of which in the years 2014-2016 were made 0.649 km long, and to 2014-0.671 km long. The project’s material scope since 2014 therefore covers: — construction of a collector discharging rain and melt water from the area of the City with a length of 3.20 km (gross inputs: PLN 20 318 015,59); — construction of rainwater treatment plants with a capacity of 5281.00 m³/day (gross inputs: PLN 3 571 280,93); — construction of a storage tank with a capacity of 26700 m³ (gross inputs: PLN 8 483 679,55); — renovation of the S-F ditch with a length of 2.2 km (gross: PLN 1 454 664,09); — road infrastructure (reconstruction, commuting) (gross inputs: 299 062,59 PLN). As part of the additional tasks, the following will be carried out: — feasibility study (gross: PLN 20 000,00); — supervision of construction works (gross inputs: PLN 60 000,00); — personal expenditure (project management) (gross expenditure: PLN 36 000,00); — information and promotion activities (gross inputs: PLN 20 000,00); — elaboration of the Urban Plan for Adaptation to Climate Change (gross: 45 000,00 PLN). The main objective of the project is to improve flood protection and improve water status by ordering the management of rain and meltwater in the Municipality of Świdnik. The water from the scanned area will be sent to the rainwater treatment plant, and then through the retention tank will be transferred to a stable receiver – the Stawek-Stoki river. The implementation of the project will contribute to improving the environment – the content of suspensions and petroleum substances will be reduced and the quality of groundwater and surface water will be improved.