Kohesio: discover EU projects in your region

project info
Start date: 1 April 2017
End date: 31 December 2023
funding
Fund: Cohesion Fund (CF)
Total budget: 18 000 000,00 €
EU contribution: 18 000 000,00 € (100%)
programme
Programming period: 2014-2021
Managing authority: Ministerstwo obsługujące ministra właściwego ds. rozwoju regionalnego

Protection of sea shores in the Hel Peninsula

The scope of the project: The main element of the project is the reconstruction of the spires in the section from 0.3 km in Władysławów to 12.3 km in Kuźnica. Existing spurs (approx. 110 pcs) will be liquidated. 4 spurs will be left, which were made in 2012 and 5 spires at the breakwater of the Port Władysławowo. The system for rebuilding will be made of wooden piles.The system will consist of about 144 sharpeners. The length of the section on which the task will be performed in relation to the length of the section to be protected according to the POBM shall be 59 %. Output indicators: Number of built devices for flood protection purposes – pcs. 1 Results indicators: The length of the coastline on which the conservation activities of the sea shores are carried out – 12 km.

Flag of Poland  Gdański, Poland