The project aims at the construction of the S6 Słupsk – Gdańsk expressway, pc. Bowiepole Wielkie – the beginning of the Tri-City ring road. 40.85 km, located in the TEN-T comprehensive network. The project is implemented in the P&B system as part of 3 tasks: — Task 1: Bożepole Wielkie (with a knot) – Fr. Luzino (with a knot), – Task 2: Luzino knot (without knot) – w. Szemud (with a knot), – Task 3: Szemud knot (without a knot) – w. Gdynia Wielki Kack (with a knot).