The project includes the extension of the existing Al. 29 November (from St. Opole to the border of the city) on the length of approx. 2.6 km with reconstruction of engineering facilities, extension, reconstruction and construction of infrastructure: dehydration, lighting, light-signalling and colliding weapons. The planned route coincides with the existing street route. The project will provide a load capacity of 115 kN/axis. The main objective of the project is to increase Kraków’s transport accessibility.