Kohesio: discover EU projects in your region

project info
Start date: 1 January 2014
End date: 30 June 2023
funding
Fund: European Regional Development Fund (ERDF)
Total budget: 31 787 735,27 €
EU contribution: 27 019 574,98 € (85%)
programme
Programming period: 2014-2021
Managing authority: Ministerstwo obsługujące ministra właściwego ds. rozwoju regionalnego
beneficiary

Improvement of transport conditions on national road No. 92 in Poznań

The subject of the project is the implementation of the reconstruction of a section of national road No. 92, consisting of 3 independent stages: I ETAP – extension ul. Baltic Sea from the Lech Bridge to the intersection with ul. It’s a mermaid. The line of national road No. 92 on the section from the Lech Bridge to the intersection with ul. The Mermaid. 1.412 km, from km 0 + 000 to km 1 + 412.49 to cross section 2x2 (roads separated by green belt) and extension of intersections with ul. Gdynia, Syrenia and Chemiczna.II ETAP – reconstruction of the northern thread of the Lech Bridge. The line of national road No. 92 located in the lane of Lechicka and Baltica streets consisting of its extension to the 3-pass section and adapting the new structure to the higher load class by length. 0.386 km from km 0 + 000 to km 0 + 386.50III ETAP – construction of the ‘Nowa Naramowicka’ junction located at the junction of ul. Naramowicka and Lechicka by long. 0.773 km from km 0 + 025.24 to km 0 + 798.00 and ul. New Naramowicka is long. 0.972 km (train of national road No. 92) from km 0 + 847.24 to km 1 + 819,17 allowing, among others, a collision-free journey on the street. Lechicka in the area of this intersection with the reconstruction of the rainwater drainage at ul. Serbian and Lechtic.

Flag of Poland  Miasto Poznań, Poland