Design and execution of construction works for the reconstruction of the two-track tram route within Wierzbięcice Streets and 28 June 1956 in Poznań. The project involves the reconstruction of: track infrastructure, network infrastructure, bus stop infrastructure, underground installations (to the extent provided for by the technical conditions of the Gestadents of the network) as well as road pavements and pedestrian routes forming an integral part of the utility area of the streets covered by the project.