Design and execution of construction works for the construction of a two-tier tram route in the street. Naramowice on the section from the Wilczak loop to the area of ul. It’s a clown. The project involves the construction of: track infrastructure, network infrastructure, engineering downstream infrastructure, underground installations to the extent of the technical conditions of the network’s Gestapo, road pavements and pedestrian tracks forming an integral part of the street space covered by the project.